AreaNova TakeoffBid Readiness Command Center
A101 extracted · Flooring · estimator review required
Estimator workstation with bid readiness dashboard and plan takeoff overlays
Bid-readiness command center: plans, overlays, confidence, defects, and controlled export.
Drawing RegisterA101 · Rev demo · OCR indexed
Trade PackageFlooring · area, base, transitions
Review StatusEstimator review · QA controlled
DeliverableMarked plan · issue log · CSV report
Synthetic A101 floor plan
Extracted Sheet Data
A101Detected sheet
94%Title block confidence
2,960 SFFloor area measured
$27,297Draft total
Bid Readiness
--
Review required
Quality state has not loaded.
Before / After Proof
3hManual baseline
12mReviewed draft
$12.8kRisk flagged
50%Customer readiness
Research Recommendations
Wedge: Bid-readiness control, not generic AI takeoff.
Moat: Visual proof, scope gaps, audit trail, and estimator override.
Next build: Real scale calibration, revision compare, and source-linked screenshots.
Sales test: Ask contractors if fewer missed scope items beats faster takeoff.
Construction Review Model
DMAIC Control
Control Metrics
--First-pass yield
--Open defects
--Review owner
--Next action
Quality Gate
Defects / Risk
Open Items / Assignments
Scope Gap Watch
Revision Delta
Selected Area
Lobby 101
LVT-1 · 522 SF · 86 LF base · confidence 93%
Design Preview
Source Proof
Audit Trail
Quantity Review
Room Finish Area Base Conf.
Estimate Preview
Item Qty Total
Export Preview